Skip to content
Wind farm Schleswig-Holstein

Reference project

Wind farm Schleswig-Holstein

Access and surfaces for 18 wind turbines – heavy loads and tight time windows.

Result
18 WTGs · full service

Challenge

Access and surfaces for 18 wind turbines – heavy loads and tight time windows.

Solution

Complete access-road package: material, transport, installation, and removal from a single source, aligned with heavy-haul transport.

Result

All turbines reachable on site – without separate interfaces between rental and logistics.

Your next project?

Tell us about the challenge and timeframe – we will respond with a concrete proposal.

Inquire now
Wind farm Schleswig-Holstein | MeyerKoldingen Gruppe