Skip to content
ULTRANET HVDC route

Reference project

ULTRANET HVDC route

Site-road logistics for a 340 km DC connection between North Rhine-Westphalia and Baden-Württemberg.

Result
340 km route

Challenge

Site-road logistics for a 340 km DC connection between North Rhine-Westphalia and Baden-Württemberg.

Solution

Scalable material deployment, nationwide dispatch and close coordination with line-construction partners.

Result

Reliable supply of route sections despite high complexity and long distance.

Your next project?

Tell us about the challenge and timeframe – we will respond with a concrete proposal.

Inquire now