Challenge
120 kilometers of route with temporary access under time pressure and changing ground conditions.
Solution
Combined use of excavator mats and steel plates, own crane trucks for installation and removal, dispatch hand in hand with specialized transport.
Result
Continuous site-road logistics along the entire route – on time and on material.