6 projects – challenge, solution and result.

120 km of site road

Overhead line construction Uckermark

Challenge
120 kilometers of route with temporary access under time pressure and changing ground conditions.
Solution
Combined use of excavator mats and steel plates, own crane trucks for installation and removal, dispatch hand in hand with specialized transport.
Result
Continuous site-road logistics along the entire route – on time and on material.
View project details

18 WTGs · full service

Wind farm Schleswig-Holstein

Challenge
Access and surfaces for 18 wind turbines – heavy loads and tight time windows.
Solution
Complete access-road package: material, transport, installation, and removal from a single source, aligned with heavy-haul transport.
Result
All turbines reachable on site – without separate interfaces between rental and logistics.
View project details

340 km route

ULTRANET HVDC route

Challenge
Site-road logistics for a 340 km DC connection between North Rhine-Westphalia and Baden-Württemberg.
Solution
Scalable material deployment, nationwide dispatch and close coordination with line-construction partners.
Result
Reliable supply of route sections despite high complexity and long distance.
View project details

DK → DE · oversize

Agricultural machinery Denmark → Ingolstadt

Challenge
Cross-border transport of agricultural machinery with oversize dimensions and tight delivery dates.
Solution
Vehicle selection within permit limits, load securing and complete dispatch including escort where needed.
Result
On-time delivery – one contact from collection to destination, including the permit path.
View project details

380 kV · 50Hertz

Grid reinforcement Anklam 380 kV

Challenge
Site-road and transport logistics for 50Hertz’s 380 kV grid expansion in Mecklenburg-Western Pomerania.
Solution
Across the group: access-road material plus specialized transport and central dispatch.
Result
Coordinated workflows between access and material transport – without interface breaks.
View project details

3,000 steel plates

Site road Leipzig

Challenge
Temporary access for a major construction site with a high share of heavy loads.
Solution
Large-scale use of anti-slip steel plates, delivered and laid with our own cranes.
Result
Load-bearing site roads for construction traffic – quick to install and remove.
View project details

Your next project?