120 km of site road
Overhead line construction Uckermark
- Challenge
- 120 kilometers of route with temporary access under time pressure and changing ground conditions.
- Solution
- Combined use of excavator mats and steel plates, own crane trucks for installation and removal, dispatch hand in hand with specialized transport.
- Result
- Continuous site-road logistics along the entire route – on time and on material.